• slideshow
  • slideshow
  • slideshow
  • slideshow
  • slideshow
  • slideshow
  • slideshow
  • slideshow
  • slideshow


Infrastructure and Facilities

1. Total Land Area:- 10 Acar 36 Kanal

2. Covered Area block 'A'-: 1266.00m2

                           block 'B'-: 3187.50m2

                           block 'C'-: 720.00m2

3. Power Load:- 213.80 KW

                                                                                                            Block -A

 

Sl. No. Name of Trade Required Area Available Area Running Units
1

Workshop ( Fitter-I)

88m2 88m2 1+1=2
2

Workshop (Fitter-II)

88m2 88m2 1+1=2
3 Workshop (Welder-I) 80m2 80m2 1+1=2
4 Workshop ( Tool& Die(Dies & Moulds) 130m2 130m2 1+1=2
5 Computer/IT Lab  50m2 55m2  
6 Principal Office 20m2 29m2  
7 Office 50m2 53m2  
8 Store 90m2 173m2  
9 Placement Room 20m2 20m2  
10 Reception Cum Waiting Lobby 1 No. 32m2  
11 Toilet Staff(Gents) 01 Nos. 10m2  
12 Toilet Staff (ladies) 01Nos. 06m2  
13 Toilet Students 01Nos. 12m2  
14        

       

                                                                                                             Block -B

 

 

. No. Name of Trade Required Area Available Area Running Units
1

Workshop (Carpenter-I)

120m2 125m2 1+1=2
2

Workshop (Turner-I)

110m2 110m2 1+1=2
3 Workshop (Turner -II) 110m2 110m2 1+1=2
4 Guest Room 20m2 20m2  
  5 G.I. Office 1 No. 13m2  
6 G.I. Office 1 No. 23m2  
7 Workshop( Machinist-I) 130m2 166m2 1+1=2
8 Toilet Staff (Gents) 01Nos. 12m2  
9 Toilet Boys 02Nos. 18m2  
10 Library and First Aid Room 55m2 62m2  
11 Workshop (Electronic Mechanic -I) 56m2 63m2 1+1=2

                                                                       

12 Workshop( Electrician-I) 98m2 101m2 1+1=2
13 Drinking water cooler 01No. 09m2  
14 Drawing Hall-I 50m2 50m2  
15

Drawing Hall -II

50m2 50m2  
16

Workshop( Wireman -I)

88m2 98m2 1+1=2
17 Toilet Staff (Gents) 01 No. 12m2  
18 Toilet Boys 02Nos. 20m2  
19 Toilet Girls 01No. 16m2  
20 Staff Common Room 1 No. 22m2  
21 workshop (Plumber-I) 80m2 53m2 1+1=2
22 Workshop( Electrician -II) 98m2 101m2 1+1=2
23 Water cooler Drinking  01No. 09m2  
24 Toilet staff(Gents) 12m2  
25 Toiler staff(Ladies) 01No. 16m2  
26 Toilet Girls 01No. 16m2  
27 Toilet Boys 01 No. 12m2  
28 Workshop (Plumber-II) 80m2 63m2 1+1=2
29 D.M.C. Computer Lab 50m2 50m2  
30 Workshop(D.M.C-I) 64m2 75m2 1+1=2
31 Workshop(Wireman -II) 88m2 98m2 1+1=2
32 G.I. Room 01No. 22m2  

                                                                                              Block-c

         

No. Name of Trade Required Area Available Area Running Units
1

G.I. Office

01 No. 12m2 1+1=2
2

Drinking Water Facilities

01 No. 10m2 1+1=2
3 Toilet Differently Abled Person 01 No. 03m2 1+1=2
4 Toilet Ladies staff 01 No. 10m2  
5 Toilet Girls  01 No. 11m2  
6 C.N.C. Lab 65m2 85m2  
7 Workshop (Fashion Design Tech.-I) 64m2 85m2 1+1=2
8 Workshop  85m2 85m2  
9 Workshop(SSA Hindi-I) 48m2 80m2  
10 Toilet Staff Gents 01 No. 12m2  
11 Toilet Boys 01 No. 12m2  
12 Stair Width 01 No. 2.5m2 1+1=2

 

 

 

 

 

Library

Following News Paper, Books, Magazines etc. are available in the library:-

  • Lakshay Magazine
  • Competition Success Review Magazine.
  • Current Affairs Magazine
  • Chip Computer Magazine
  • General Knowledge 2013 Book
  • DainikBhaskar Newspaper
  • The Times of India Newspaper
  • Hindi RojgarSamacharNewspapers

 

 
 
Administrator Login
Username:
 

Welcome Administrator

Trough this panel, you can edit content of your website.

If you find any difficulty while logging in. please call your website provider for support.